Case Studies

ROADBOND EN 1:
Client References

Kay Bailey Hutchinson
Senator, Texas

United States Senate
Washington, D.C. 20510-4304

April 23, 1996 - "I am pleased to extend my sincere congratulations to you and your company for being named to the eight annual Tarrant Export 40 list. Because export activities help support the economic development of the greater Fort Worth area -- vital to the community's economic health -- it is important to acknowledge and advance your contribution in this area." Click here to read letter from Kay Bailey Hutchinson in PDF

 

Senator, Phil Gramm
Senator, Texas
United States Senate
Washington, D.C. 20510-4304

April 2, 1996 - "As one of those listed in the Tarrant Export 40, your company is a proven leader in export sales.  Again, I offer my congratulations on your fine achievement. May your future endeavors be as rewarding and successful." 
Click here to read the letter from Senator, Phil Gramm in PDF

Robert D. Smith Jr., SET
President
QC Laboratories, Inc.
Geotechnical & Materials Consultants

December 1, 1995 - "During the summer of 1994, QC Laboratories, Inc. was retained as project manager and testing laboratory for the reconstruction of all streets within the City of Oakridge North.  That responsibility included the design of a new pavement structure that would fall within the City's budget.  This was accomplished by using Portland cement enhanced with EN1."  Click here to read letter from QC Laboratories in PDF


Ralph Apodaca
Texas Department of Transportation (TxDOT), Ft. Worth District, PO Box 6868, Ft. Worth, TX  76115-0868, 817.292.6952

March 25, 1994 - "The use of ROADBOND EN 1 to stabilize the existing material resulted in a $25,000 to $35, 000 savings and it still is holding up well after two years." Click here to read letter from TXDOT in PDF

Thurman W. Thompson
Roadway Maintenance Supervisor
District 19,
Texas Department of
Transportation (TxDOT),
PO Box 207 New Boston, TX  75570

March 16, 1994 - "In late winter 1992, ROADBOND EN 1 was used to treat two problem areas on FM 561 near Dalby Springs in Bowie County.  These problem areas resulted in a combination of springs seeping under the road and heavily loaded trucks bypassing a weak bridge on US 259.

"Before ROADBOND EN 1 was applied to the base material on these seep areas, they required maintenance at least once per year.  They have now gone over two years with no signs of failure..."I have used ROADBOND EN 1 in other areas with similar results."  Click here to read letter from Thurman W. Thompson of TXDOT in PDF

Additonal Reference Letters:

 


ROADBOND EN 1 / C.S.S. Technology, Inc. / P.O. Box 549, Tolar, Texas 76476 / 800-305-6190